11500-Customer Service and Power Cut Information

Contact the HEDNO Customer Call Center (11500) Daily, 24/7
- For general customer support (information and queries)
- For power cut reporting
11500 is a countrywide helpline.
If you are calling from abroad please use +30 2111900500.
All call charges are based on your landline or mobile provider tariffs. To avoid additional charges you can call 2111900500 .
We provide the following services:
Α INFORMATION
1. CONNECTIONS WITH THE NETWORK
• First Time Customer
• Building under construction (site power supply)
• Permanent site power supply
• Unification-Separation of supplies
• Power supply to properties without a permit
2. MODIFICATIONS TO EXISTING SUPPLIES
• Reconnection
• Changing user of power supply
• Interruption of power supply following customer’s request
• Disconnection & Reconnection due to debts
• Increasing-Decreasing power supply
• Change of use
• Supply Dismantling
• Meter Reinstallation
3. CHANGES – REARRANGEMENTS
• LV meter
• Pole, wire
• Adjacent line/change of network
• Distribution Substations
4. WORKS IN POWER SUPPLY
• Blown fuse
• Meter’s broken glass
• Sealing meter
• Drop of micro switch
5. LICENSED ELECTRICIAN CERTIFICATION
6. RESIDENTIAL OFF-PEAK TARIFF
7. METERING
8. MONOPOLISTIC CHARGES (REGULATED)
9. FAULTS – INCIDENTS – PLANNED POWER INTERRUPTIONS
10. ACKNOWLEDGEMENTS-NOTIFICATIONS BY CUSTOMERS
• Dangers
• Keeping safety distance
• Lamps of Municipal lighting
11. SOCIAL RESIDENTIAL TARIFF – VULNERABLE CUSTOMERS – SOLIDARITY SERVICES TARIFF
12. ISSUES REFERRING TO ELECTRICITY PRODUCERS
13. ISSUES REFERRING TO ELECTRICITY SUPPLIERS
14. OTHER ISSUES
Β. REQUESTS
1. RECEPTION OF INDICATIONS BY THE CUSTOMER
• Indications of regular metering
• If an Estimated Bill is issued instead of an Actual Bill
• Correction of the Actual Bill
• Solution for rejection of bill issuance
2. PENDING REQUESTS FOR LONG PERIOD OF TIME (Reconnection, Succession, Application for power interruption etc.)
3. RECEPTION OF REQUESTS FOR NIGHT TARIFF
4. RECEPTION OF REQUESTS FOR METER CHECK
5. RECEPTION OF REQUESTS FOR SUPPLY/IES REARRANGEMENT
6. CHANGE OF THE AGREED POWER (INCREASE OR DECREASE) OF EXISTING SUPPLY
C. POWER CUT REPORTING
RECEIVING REPORTS FOR POWER CUTS